How to Prepare Your Facility for a Solar or Hybrid Installation in 30 Days


Nigerian C&I managers can fast-track solar readiness with this proven 4-week checklist. Facilities that complete prep work upfront cut EPC timelines from 120 to 90 days and avoid ₦20M+ in change orders.

Week 1: Data Collection (Baseline Locked)

Meter Your Reality (7 Days Mandatory)

text
□ Total kWh: Main meter log (8AM-6PM vs 6PM-6AM daily) □ Diesel: Tank gauge + genset hour meter (liters/day confirmed) □ Grid: Voltage logger (sags <400V?), outage hours/week □ Circuits: 3-phase vs single-phase split (HVAC separate)

Quick Wins:

  • Export data to Excel (template on request)

  • Photos: Roof access points, parapets, electrical room

  • Current bill: Last 3 months tariffs + diesel invoices

Week 2: Physical Site Assessment

Roof Reality Check:

text
□ Available area: Google Earth polygon (min 1,000m²/MW) □ Load capacity: Engineer confirms 20kg/m² panels + wind □ Shading: Trees/chimneys/parapets (drone survey ₦500k) □ Access: Crane path, worker safety (fall protection ready)

Electrical Room Audit:

text
□ Space: 20m²/MW inverter room (dust-proof, ventilated) □ Switchboard: 415V 3-phase spare breakers □ Earthing: 300m grid exists? Lightning protection?

Week 3: Approvals & Clearances

Fast-Track Permitting:

text
□ NERC: Embedded generation application (≤1MW = 30 days) □ State ESD: Lagos/Ogun clearance (14 days with agent) □ Fire: Panel spacing certificate (0.5m edges minimum) □ Landlord: Estate approval (Lekki/VGC common delay)

Internal Alignment:

text
□ Capex approval: CFO signs off 3 financing options □ FM team: Nominated for 2-day training □ Tenants: MOUs for multi-building sites

Week 4: Commercial Lock-In

Financing Decision:

text
□ Cash >₦500M? → Equity (38% IRR) □ Need fast ROI? → PPA ₦48/kWh fixed □ SME? → CBN green loan 9% × 5 years

EPC Contract Ready:

text
□ Fixed price: ₦450M/MW all-in (no escalation) □ Timeline: 90 days to commissioning □ Performance: 82% PR guarantee Month 1 □ Storage-ready: Pre-wired DC bus Year 3 expansion

Common 30-Day Pitfalls (Avoid These)

MistakeCost ImpactFix
No meter data+12 weeks delayWeek 1 mandatory
Roof fails load+₦65M reinforcementWeek 2 engineer
NERC permit late+60 days grid syncWeek 3 agent
FM team missing14-day downtimeWeek 3 nominate

Your 30-Day Deliverables Checklist

text
□ [ ] 7-day meter data exported □ [ ] Roof engineer report □ [ ] NERC application submitted □ [ ] Financing term sheet signed □ [ ] FM team nominated □ [ ] EPC contract ready to execute

Lagos Factory Result: Week 1 prep → Day 85 commissioning vs 165 days average.

Upthrust 30-Day Accelerator: Complete this checklist → we guarantee 90-day EPC start or credit your deposit.

Upload your Week 1 meter data today—get complete roadmap + savings projection in 24 hours.